
NEW MATERIALS & GREEN TECHNOLOGY
Advanced Technology Materials. Green Transition Solutions.
Connecting supply chains for eco-friendly architectural cladding, lightweight structures, and next-generation electric commercial transport for modern industrial facilities.
Adopting & Transferring Core Technologies
An Tri pioneers the adoption and transfer of new technologies, new materials, and green materials across construction, architecture, new-energy vehicles, and renewable power.
We aim to bring core technologies to Vietnam, making meaningful contributions to the nation's green and digital transformation journey.
100%
Green-certified materials & quality verified
03
Direct-supply core technology categories
24/7
Technical engineering support for custom sizing
Cam kết chuẩn hoá & chuyển giao công nghệ
An Trí đóng vai trò cầu nối vững chắc đưa những giải pháp vật liệu tiên tiến từ các tập đoàn công nghiệp hàng đầu thế giới về các khu công nghiệp tại Việt Nam, đảm bảo hồ sơ kỹ thuật, nghiệm thu PCCC và chứng nhận công trình xanh.
- Đầy đủ chứng chỉ C/O, C/Q và chứng nhận kiểm định
- Tối ưu vòng đời năng lượng & giảm phát thải khí nhà kính
- Đồng hành cùng chủ đầu tư trong quá trình chuyển đổi số
Three Pioneering Material & Technology Pillars
Engineered products vetted from leading global partners, ready for integration into engineering specifications and facility operations.

Green Construction Materials
High-tech unburned blocks, autoclaved aerated concrete (AAC), fire-rated insulation panels, and low-carbon structural assemblies.

Architectural Finishing Materials
Next-generation composite facade panels, large-format sintered slabs, antibacterial industrial flooring, and nano self-cleaning coatings.

New Energy & EV Vehicles
Light electric commercial trucks, intra-park logistics utility vehicles, and distributed energy storage solutions for zero-emission industrial zones.
Physical Material Samples & Test Proofs
Every material batch is supported by physical reference samples, Certificate of Origin (C/O), Certificate of Quality (C/Q), and mechanical test lab reports.

Composite Facade Panels & Structural Elements
Modern industrial facility envelopes, EI-rated fire partitions, and lightweight utility ceilings.

Eco Thermal/Acoustic Insulation & Clean Surfaces
Building insulation envelopes cutting HVAC energy consumption, chemical-resistant cleanroom flooring.
Clients, engineering consultants, and architects can request reference sample kits delivered on-site or view them directly at An Tri offices.
Commercial Pure Electric Trucks for Industrial Logistics
Zero-emission freight transport reducing operational cost per kilometer, tailored for rapid-charging infrastructure across industrial hubs.

Heavy-Duty Pure Electric Semi-Trailer Truck
High-torque heavy-duty tractor designed for container and heavy cargo haulage between key industrial corridors. High-efficiency electric powertrain slashing energy costs up to 65% versus diesel.
Ưu thế kỹ thuật chính
- High-density next-generation commercial battery pack
- Ultra-fast high-power DC charging via standard CCS2
- Heavy-load chassis with regenerative braking system

Medium-Duty Regional Electric Delivery Truck
Optimized for regional transit of consumables, components, and goods connecting seaports in Hai Phong and Quang Ninh with production plants in Bac Ninh.
Ưu thế kỹ thuật chính
- Engineered for short and medium delivery cycle rotations
- Zero tailpipe emissions and low noise in loading bays
- Seamlessly compatible with smart industrial charging posts

Need sustainable materials or EV fleet solutions for your project?
Get in touch with An Tri today for technical documentation, sample kits, and optimized financing proposals.
