Industrial construction site alongside a container yard at dusk
Stage 4 · Construction & Customs

Construction, customs & infrastructure: from the site to the customs declaration

Contractor management, design-build general contracting, machinery customs clearance and power, water and wastewater connections. An Tri keeps your site construction schedule synchronized with equipment arrival.

01 · Overview

Construction, Customs & Infrastructure

Once permits are secured, projects enter the phase most prone to schedule slippage: civil contractors, MEP installation, customs clearance and utility tie-ins must align. A production line arriving at port before the floor slab is ready, or a delayed substation connection, directly triggers demurrage costs and pushes back go-live.

An Tri coordinates all workstreams against a single master schedule while representing you before contractors, customs authorities and utility providers.

Ideal For

  • Investors building greenfield plants or fitting out leased ready-built factories.
  • Projects importing new or used production lines and machinery into Vietnam.
  • Facilities requiring EVN power, clean water, telecoms and centralized wastewater tie-ins.

Request a consultation for this service

Speak directly with an An Tri project lead.

02 · Scope of Work

Detailed Scope of Work

01

Contractor & MEP Supervision

Manage tender processes, evaluate contractor bids and supervise factory civil works and mechanical-electrical-plumbing (MEP) installation.

02

Design-Build General Contracting

Provide turnkey design-build general contracting solutions tailored to the investor's technical specifications.

03

Turnkey Machinery Customs & Logistics

Register duty-free import master lists for fixed-asset machinery; handle customs declarations, inspection clearance and inland haulage from port to factory floor.

04

Utility & Infrastructure Tie-Ins

Coordinate commercial contracts and physical tie-ins for EVN grid power, clean water, fiber internet and centralized industrial park wastewater systems.

05

Progress Monitoring & Early Risk Alerts

Deliver structured weekly and monthly progress reports with early alerts on any bottleneck affecting your go-live date.

03 · Deliverables

Statutory & Technical Deliverables

Code
3.1
Timing
Prior to construction
Deliverable Output
Tender evaluation minutes and executed civil / MEP contractor agreements
Code
3.2
Timing
Throughout construction
Deliverable Output
Weekly and monthly technical supervision and schedule tracking reports
Code
3.3
Timing
Prior to equipment shipment
Deliverable Output
Official customs confirmation of the duty-free fixed-asset machinery import list
Code
3.4
Timing
Per shipment schedule
Deliverable Output
Cleared customs declarations and equipment delivery records to the plant
Code
3.5
Timing
Prior to Go-Live
Deliverable Output
EVN power purchase agreement, water supply contract and utility tie-in handover minutes
Code
3.6
Timing
Per contract scope
Deliverable Output
Design-build general contracting package and as-built documentation (if applicable)
04 · Coordination Process

4-Step Coordination Workflow

01

Dossier Intake & Technical Review

Verify input parameters and cross-check regulatory and technical conditions for your project.

02

Workplan & Deliverable Definition

Confirm scope, document checklists and target milestones in writing.

03

Execution & Authority Representation

Draft dossiers, coordinate field inspections and represent you before authorities or counterparties.

04

Handover & Close-Out Archiving

Verify outputs, hand over original certificates/manifests and organize records for the next stage.

06 · FAQ

Frequently Asked Questions

An Tri manages, coordinates and can deliver design-build general contracting solutions; specific construction contractors are selected based on capability profiles and approved by the investor.

This content is for general informational purposes only and does not constitute formal legal advice for a specific project. Please contact An Tri for a review tailored to your project dossier.
Interior of a modern factory with an illuminated aisle

Discuss your project requirements

Leave your project details or call our advisory desk to receive the document preparation checklist for this stage.

Call nowGet a consultation