Skip to main content
ANTRI.,JSC
Policy & IncentivesEditorial & Regulatory Reference

Nam Dinh Vu Industrial Park: Strategic Epicenter in Hai Phong Free Trade Zone Model

Updated: 2026-11-186 min readAn Tri Investment Advisory Team
Aerial overview of Nam Dinh Vu Industrial Park, Hai Phong

Located in the Dinh Vu - Cat Hai Economic Zone with an integrated dedicated seaport and eco-industrial orientation, Nam Dinh Vu stands as a pivotal driver attracting FDI into Hai Phong's next-generation Free Trade Zone.

1. Strategic epicenter in Hai Phong's Free Trade Zone framework

Hai Phong City is aggressively advancing its master plan to establish a next-generation Free Trade Zone (FTZ) to build a regional high-tech manufacturing and logistics powerhouse. Within this blueprint, Nam Dinh Vu Industrial Park occupies a critical focal point in FTZ Zone 2, seamlessly connected to Lach Huyen deep-sea port and inter-regional expressways.

Spanning over 1,329 hectares, Nam Dinh Vu is systematically zoned into complementary functional areas: heavy industry, light manufacturing, liquid petrochemical storage, and a 105-hectare dedicated seaport and logistics cluster. It is Northern Vietnam's premier integrated port-industrial ecosystem facilitating turnkey supply chains from raw material import to manufacturing and global export.

  • Situated entirely within the Dinh Vu - Cat Hai Economic Zone, eligible for Vietnam's most attractive CIT incentive package (10% preferential tax rate for 15 years, 4-year exemption, 50% reduction for the next 9 years).
  • Direct interchange with the Hanoi - Hai Phong - Ha Long expressway, Cat Bi International Airport, and coastal logistical highways.
  • Customized zoning for supporting industries, precision engineering, high-tech electronics, and bonded logistics warehouses.
Nam Dinh Vu dedicated international seaport terminal, Hai Phong
Nam Dinh Vu dedicated international seaport terminal, Hai Phong

2. Dedicated port infrastructure and commitment to eco-industrial growth

The defining competitive advantage of Nam Dinh Vu is its internal dedicated seaport system featuring 7 container and general cargo berths accommodating vessels up to 40,000 DWT. Tenants operating here can slash domestic trucking costs by up to 30% and eliminate container turnaround transit delays compared to inland locations.

Beyond logistical efficiency, Nam Dinh Vu actively champions ESG benchmarks by deploying rooftop solar photovoltaic arrays across facilities, operating dedicated 110kV transformer stations, deploying advanced Grade-A biological wastewater treatment, and securing dual-source municipal industrial water.

Rooftop solar system deployed at Nam Dinh Vu Industrial Park facilities
Rooftop solar system deployed at Nam Dinh Vu Industrial Park facilities

3. How An Tri accelerates your investment at Nam Dinh Vu IP

As an experienced investment promotion and industrial advisory partner in Hai Phong, An Tri delivers a complete One-Stop Station for foreign investors entering Nam Dinh Vu: from site footprint sizing, land lease agreement negotiation, EIA environmental appraisal, IRC/ERC licensing to factory design-build and on-site customs clearance setup.

Need a review tailored to your specific dossier? Speak with An Tri.

Speak with a specialist
This content is for general informational purposes only and does not constitute formal legal advice for a specific project. Please contact An Tri for a review tailored to your project dossier.

Directly related service:

Construction, Customs & Infrastructure

Contractor management, design-build general contracting, duty-free machinery customs clearance and utility connections.

An Tri Investment Advisory Team

Investment promotion, legal compliance and industrial operations advisory team in northern Vietnam.

About

Related Insights

View all insights
Interior of a modern factory with an illuminated aisle

Preparing a project in Vietnam?

Send us your project parameters — An Tri responds within 24 business hours in your preferred language.